1 Comment
Jul 3, 2023Liked by Tucos's Child

So @ 167 thousand tons to build a 1.1GWe Nuclear Power plant that means 43e6 tons/167e3=257 NPPs could be built with the same amount material in discarded Wind Turbine blades every year. That's just the blades which are just a small portion of the total Wind Turbine mass. So in 12yrs you would have enough NPPs to supply all the World's electricity needs, rather than giant heaps of wind turbine blades.

And each NPP will last 60-100yrs, not the 10-20yrs the Wind Turbine lasts.

Expand full comment